Skip to content

July 2, 2010

3

Framing Together

Luke and I worked hard to stay ahead of the Crossroads team in framing out each of the chalets.  The team laid an eight course brick wall outside the perimeter framing.  The framing will serve to strengthen and protect the brick walls from being jarred or damaged.  It will also be the framework for contructing the bunkbeds inside each chalet.  Luke has put forth a tremendous effort with these buildings and he deserves many thanks.  Soon, very little of the framing will actually be seen on the outside of the chalet as screen/shadecloth will be used to cover the window frames on the top half and the brick walls will cover the bottom half.

Read more from Ministry News
3 Comments Post a comment
  1. Glenn
    Jul 3 2010

    Wow. Great design idea. You guys are awesome! Pass on our thanks to Luke!!

  2. Oct 9 2011

    IObytLf

Trackbacks & Pingbacks

  1. News Flash From The Front |

Share your thoughts, post a comment.

(required)
(required)

Note: HTML is allowed. Your email address will never be published.

Subscribe to comments