Flooring Finish Coat
I’m having a 2-3 inch finish coat of concrete added to the foundation floor inside every chalet. The work will hopefully give a nice smooth finish before bunk beds are installed. The concrete work has taken longer than I initially thought (1 full day of work each). Key to the success of the job is making sure the concrete/sand mix is strong enough and that an “ice rink” glaze of water on the top surface of the flooring is maintained for at least 24 hours after the pour. More pictures will be forthcoming.